RAYMOND SHAFER HW over NOBLESTOWN RD.

I 79 SB OVER SR 3048 · County 003, Pennsylvania · Built 1972 · 4 Lanes · 35,339 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000000868
Year Built
1972
Reconstructed
2006
Length
36.3 m (119.1 ft)
Max Span
35.1 m
Width
25.6 m (84 ft)
Lanes
4
Daily Traffic
35,339
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$63,000
Total Project Cost
$855,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.