OHIO RIVER BL over BIRMINGHAM AVE

2.5 MI.S.E.OF SR 0079 · County 003, Pennsylvania · Built 1930 · 4 Lanes · 23,052 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000835
Year Built
1930
Reconstructed
2012
Length
14 m (45.9 ft)
Max Span
13.1 m
Width
17.1 m (56.1 ft)
Lanes
4
Daily Traffic
23,052
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$34,000
Total Project Cost
$454,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.