SR 0065 SB over FONTELLA ST.

TR 65 SB O/FONTELLA ST. · County 003, Pennsylvania · Built 1991 · 3 Lanes · 22,423 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000000815
Year Built
1991
Length
190.8 m (626 ft)
Max Span
32 m
Width
19.5 m (64 ft)
Lanes
3
Daily Traffic
22,423
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$55,000
Total Project Cost
$741,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.