ALLEGHENY VAL EXPY over GUYS RUN ROAD (SR 1011)
2.3 MI NE OF GAMMA DR · County 003, Pennsylvania · Built 1971 · 2 Lanes · 23,171 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
40.534836, -79.845917
This bridge is in worse condition than 67.9% of bridges in County 003. The average bridge in Pennsylvania is 0 years old; this one is 55 years old.
Nearby Bridges
ALLEGHENY VAL EXPY over GUYS RUN ROAD (SR 1011)
Built 1971
SR 0028 NB over DEER CREEK
Built 1972
SR 0028 SB over COAL CO RD & BARGE BASIN
Built 1971
GUYS RUN RD over Guys Run
Built 2017
FREEPORT RD over DEER CREEK
Built 1970
SR 0028 NB over COAL CO RD & BARGE BASIN
Built 1971
SR 0028 SB over DEER CREEK
Built 1970
FREEPORT RD over BARGE BASIN
Built 1928
GUYS RUN RD over GUYS RUN
Built 2016
SR 0028 SB over RT 0910 EB WB
Built 1970
Bridge Details
- Structure #
- 000000000000630
- Year Built
- 1971
- Reconstructed
- 2008
- Length
- 43.6 m (143 ft)
- Max Span
- 16.8 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 23,171
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $45,000
- Total Project Cost
- $602,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.