US 30; SR 0030 over SWIFT RUN

2 1/2 MI.W. OF NEW OXFORD · County 001, Pennsylvania · Built 1929 · 2 Lanes · 12,324 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000000052
Year Built
1929
Reconstructed
2008
Length
12.8 m (42 ft)
Max Span
5.5 m
Width
16.7 m (54.8 ft)
Lanes
2
Daily Traffic
12,324
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,000
Total Project Cost
$233,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.