NF 1993 over COUGAR DAM
COUGAR DAM SPILLWAY · County 039, Oregon · Built 1959 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.129314, -122.23755
This bridge is in worse condition than 37.4% of bridges in County 039. The average bridge in Oregon is 0 years old; this one is 67 years old.
Nearby Bridges
ROAD over SLIPOUT
Built 1974
NO DATA ENTERED over COUGAR CREEK
Built 2012
ROAD over E FK MCKENZIE R
Built 1960
ROAD over S FK MCKENZIE RIVER
Built 1959
ROAD over MCKENZIE RIVER
Built 1951
PUBLIC ROAD over MCKENZIE RIVER
Built 2012
KING ROAD WEST over MCKENZIE RIVER
Built 1966
OR 126 (HWY 015) over MILL CREEK
Built 1966
ROAD over DELTA CR
Built 1974
DELTA ROAD over WEST FORK HORSE CREEK
Built 1950
Bridge Details
- Structure #
- CEPNPPOR000CD01
- Year Built
- 1959
- Length
- 29.8 m (97.8 ft)
- Max Span
- 13.7 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $262,000
- Total Project Cost
- $393,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.