HALL BLVD over FANNO CREEK

002 E OF GREENWAY BLVD · County 067, Oregon · Built 1981 · 5 Lanes · 35,412 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
BB004 909100217
Year Built
1981
Length
14.9 m (48.9 ft)
Max Span
14.6 m
Width
25.3 m (83 ft)
Lanes
5
Daily Traffic
35,412
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.