CAMP MORRISON RD over NEAL CR

062 MI SE HWY 226 · County 043, Oregon · Built 1972 · 2 Lanes · 26 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
83062 083000620
Year Built
1972
Length
15.5 m (50.9 ft)
Max Span
15.2 m
Width
4.9 m (16.1 ft)
Lanes
2
Daily Traffic
26
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.