County RD 59 over Catching Slough
100 FT WEST SUMNER STORE · County 011, Oregon · Built 1974 · 2 Lanes · 598 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
43.282767, -124.152069
This bridge is in worse condition than 88.6% of bridges in County 011. The average bridge in Oregon is 0 years old; this one is 52 years old.
Nearby Bridges
COUNTY RD 23 over LONE TREE/CATCHING SLOUG
Built 1986
Catching Slough Rd over Matson Creek
Built 2008
FAS A-396 over COOS CITY/ISTHMUS SLOUGH
Built 2006
OR 42 (HWY 035) WB over DAVIS SLOUGH
Built 1987
US101(HWY009) NB over SOUTHPORT SLOUGH
Built 2018
US101(HWY009) SB over SOUTHPORT SLOUGH
Built 2018
COUNTY RD 55G over DANIELS CREEK #4
Built 1971
OR 42 (HWY 035) EB over US 101 NB (HWY 009)
Built 1959
COUNTY RD 55G over OSCAR FRANZ/DANIELS CR.
Built 1981
COUNTY RD 118G over NOBLE CREEK
Built 1970
Bridge Details
- Structure #
- 6C117 059 00454
- Year Built
- 1974
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.5 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 598
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.