MAIN ST over FANNO CREEK

0025 MI SOUTH PACIFIC HWY · County 067, Oregon · Built 1991 · 2 Lanes · 12,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
67T001000000000
Year Built
1991
Length
21.6 m (70.9 ft)
Max Span
21 m
Width
22.3 m (73.2 ft)
Lanes
2
Daily Traffic
12,750
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.