CEDAR CANYON ROAD over SMALL STREAM

015 MI W HWY 47 · County 067, Oregon · Built 1996 · 2 Lanes · 1,755 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
671287006400150
Year Built
1996
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
1,755
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$106,000
Total Project Cost
$169,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.