MOSSIE ROAD over DRY GULLY

0.5 MI E SOAP HILL ROAD · County 059, Oregon · Built 1952 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
59C656147200048
Year Built
1952
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
150
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.