NORTH LOOP ROAD over STAGE GULCH DITCH
1.5 MI NE OF S EDWARDS RD · County 059, Oregon · Built 1963 · 2 Lanes · 529 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
45.787886, -119.184603
This bridge is in worse condition than 76.3% of bridges in County 059. The average bridge in Oregon is 0 years old; this one is 63 years old.
Nearby Bridges
BARTLEY RD over US FEED CANAL
Built 1997
COOPER ROAD over US FEED CANAL
Built 2001
NORTH ASH ROAD over STAGE GULCH DITCH
Built 1986
COOPER ROAD over STAGE GULCH DITCH
Built 2006
BARTLEY RD over FURNISH DITCH
Built 2022
STAGE GULCH ROAD over FURNISH DITCH
Built 1920
STAGE GULCH ROAD over US FEED CANAL
Built 2005
GEIST ROAD over STANFIELD CANAL
Built 1998
S. EDWARDS ROAD over U.S.R.S. CANAL
Built 1984
NORTH LOOP ROAD over U.S. FEED CANAL
Built 1951
Bridge Details
- Structure #
- 59C194117500452
- Year Built
- 1963
- Length
- 11 m (36.1 ft)
- Max Span
- 10.4 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 2
- Daily Traffic
- 529
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $150,000
- Total Project Cost
- $240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.