GURDANE ROAD over SPRING HOLLOW CREEK

12.5 MI S OF HWY 74 · County 059, Oregon · Built 1966 · 2 Lanes · 40 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 7 Good
Substructure 5 Fair

Location

45.305478, -119.111964

This bridge is in worse condition than 76.3% of bridges in County 059. The average bridge in Oregon is 0 years old; this one is 60 years old.

Nearby Bridges

Bridge Details

Structure #
59C013142501253
Year Built
1966
Reconstructed
1987
Length
7.6 m (24.9 ft)
Max Span
7 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
40
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.