GURDANE ROAD over SPRING HOLLOW CREEK
12.5 MI S OF HWY 74 · County 059, Oregon · Built 1966 · 2 Lanes · 40 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
45.305478, -119.111964
This bridge is in worse condition than 76.3% of bridges in County 059. The average bridge in Oregon is 0 years old; this one is 60 years old.
Bridge Details
- Structure #
- 59C013142501253
- Year Built
- 1966
- Reconstructed
- 1987
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.