POWDER CREEK ROAD over NESTUCCA RIVER
3.0 MI SOUTHEAST BLAINE · County 057, Oregon · Built 1963 · 1 Lanes · 17 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
45.253144, -123.659314
This bridge is in worse condition than 79.8% of bridges in County 057. The average bridge in Oregon is 0 years old; this one is 63 years old.
Nearby Bridges
ROAD over NIAGARA CREEK
Built 1964
ROAD over NESTUCCA RIVER
Built 1963
ROAD over NESTUCCA RIVER
Built 1983
CASON ROAD NO 865 over EAST CREEK
Built 1989
MOON CREEK ROAD over EAST CREEK
Built 2005
BLAINE ROAD over MOON CREEK
Built 1960
EAST CREEK ROAD over EAST CREEK
Built 1990
03 S 06 W 13.00: over NESTUCCA RIVER
Built 1964
03 S 06 W 13.00: over NESTUCCA RIVER
Built 2002
BLAINE ROAD over NESTUCCA RIVER
Built 1971
Bridge Details
- Structure #
- 57C47 866 00005
- Year Built
- 1963
- Length
- 31.1 m (102 ft)
- Max Span
- 29.6 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 17
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $327,000
- Total Project Cost
- $523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.