ST. PAUL HWY over CHAMPOEG CREEK

03.1 EAST OF ST. PAUL · County 047, Oregon · Built 1968 · 2 Lanes · 1,183 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
47C05 008 00000
Year Built
1968
Length
29.3 m (96.1 ft)
Max Span
6.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
1,183
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.