OWYHEE RIVER C1025 over OWYHEE RIVER (ROME)
021 M NW ROME · County 045, Oregon · Built 1906 · 1 Lanes · 20 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
3
Serious
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 3 | Serious |
| Substructure | 4 | Poor |
Location
42.865983, -117.648775
This bridge is in worse condition than 99.4% of bridges in County 045. The average bridge in Oregon is 0 years old; this one is 120 years old.
Nearby Bridges
Bridge Details
- Structure #
- 45C611102500020
- Year Built
- 1906
- Reconstructed
- 1996
- Length
- 85.3 m (279.9 ft)
- Max Span
- 45.7 m
- Width
- 5 m (16.4 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $897,000
- Total Project Cost
- $1,435,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.