MAAG RD C-1111 over WILLOW CREEK EB

0039 MI N INTER HWY 26 · County 045, Oregon · Built 1976 · 2 Lanes · 81 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
45C114111100059
Year Built
1976
Length
13.7 m (44.9 ft)
Max Span
13.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
81
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.