DRIVEWAY over BEAR CREEK

.9MI S HWY 18 · County 041, Oregon · Built 1914 · 1 Lanes · 5 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
41C26 10900 000
Year Built
1914
Length
21.3 m (69.9 ft)
Max Span
20.4 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
5
Material
Prestressed Concrete
Design
Slab
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$224,000
Total Project Cost
$359,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.