GIUSTINA ROAD over GOSSAGE CREEK

12.4 M SOUTH CITY DEXTER · County 039, Oregon · Built 1981 · 1 Lanes · 183 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
39C621612400036
Year Built
1981
Length
15.2 m (49.9 ft)
Max Span
7.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
183
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$160,000
Total Project Cost
$256,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.