N FORK SIUSLAW RD over SHOEMAKER CREEK

030 MI NE MAPLETON · County 039, Oregon · Built 1975 · 2 Lanes · 81 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
39C534507001792
Year Built
1975
Length
12.2 m (40 ft)
Max Span
5.8 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
81
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.