CROW ROAD over SPENCER CREEK OFLOW

05 MI SW JCT CROW R HWY26 · County 039, Oregon · Built 1976 · 2 Lanes · 2,150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
39C31A423400501
Year Built
1976
Length
25.6 m (84 ft)
Max Span
8.5 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
2,150
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.