RIVERVIEW DRIVE over WILLAMETTE RIVER OVERFLO

050 MI SE JUNCTION CITY · County 039, Oregon · Built 1974 · 2 Lanes · 193 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
39C308313500050
Year Built
1974
Length
34.1 m (111.9 ft)
Max Span
8.5 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
193
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$359,000
Total Project Cost
$574,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.