BRIDGE STREET over CHRISTOPHER CREEK

005 MI S HWY 126 · County 039, Oregon · Built 1978 · 2 Lanes · 1,463 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
39C112106000008
Year Built
1978
Length
23.8 m (78.1 ft)
Max Span
7.6 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
1,463
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.