ROYAL AVE over AMAZON CREEK

029 MI W EUGENE · County 039, Oregon · Built 1975 · 2 Lanes · 7,515 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
39C007145500259
Year Built
1975
Length
15.8 m (51.8 ft)
Max Span
8.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
7,515
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$167,000
Total Project Cost
$266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.