2-16 over COX CREEK

017-WEST-HWY NO395 · County 037, Oregon · Built 1976 · 2 Lanes · 348 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
37C0102-1600195
Year Built
1976
Length
10.1 m (33.1 ft)
Max Span
9.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
348
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.