WATERS CREEK ROAD over WATERS CREEK
T37S-R7W-S5/8 JOSEPHINE · County 033, Oregon · Built 1955 · 1 Lanes · 597 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
42.372058, -123.555172
This bridge is in worse condition than 39.7% of bridges in County 033. The average bridge in Oregon is 0 years old; this one is 71 years old.
Nearby Bridges
US 199 (HWY 025) over WATERS CREEK
Built 1927
SLATE CR ROAD over SLATE CREEK
Built 1954
SLATE CREEK ROAD over SLATE CREEK
Built 2015
SLATE CREEK ROAD over BEAR CREEK
Built 1975
US 199 (HWY 025) over SLATE CREEK
Built 1927
US 199 (HWY 025) over SLATE CREEK
Built 1927
US 199 (HWY 025) over BUTCHER KNIFE CREEK
Built 1927
37 S 07 W 10.00: over SLATE CREEK
Built 1967
ELLIOT CREEK ROAD over SLATE CREEK
Built 2012
37 S 07 W 13.00: over CHENEY CREEK
Built 1986
Bridge Details
- Structure #
- 367005367000108
- Year Built
- 1955
- Reconstructed
- 1998
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 597
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $80,000
- Total Project Cost
- $128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.