WEST BOUNDARY RD over SCOTT CREEK
029 MI W OF HWY 97 · County 035, Oregon · Built 1978 · 2 Lanes · 68 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
42.881881, -121.884064
This bridge is in worse condition than 40.7% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 48 years old.
Nearby Bridges
Bridge Details
- Structure #
- 35C364067500290
- Year Built
- 1978
- Reconstructed
- 1988
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 68
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.