IVORY PINE ROAD over MERYL CREEK

056 MI N HWY 140 · County 035, Oregon · Built 1970 · 2 Lanes · 434 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
35C223125700560
Year Built
1970
Length
7.6 m (24.9 ft)
Max Span
7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
434
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.