ROCKY POINT ROAD over FOURMILE CREEK
009 MI N OF HWY 140 · County 035, Oregon · Built 1965 · 2 Lanes · 546 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.461825, -122.106114
This bridge is in worse condition than 9.3% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 61 years old.
Bridge Details
- Structure #
- 35C182052900090
- Year Built
- 1965
- Length
- 24.4 m (80.1 ft)
- Max Span
- 23.8 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 546
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.