OLD MIDLAND ROAD over IRRIGATION CANAL
043 MI E OF HWY 97 · County 035, Oregon · Built 1971 · 2 Lanes · 409 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.126258, -121.746069
This bridge is in worse condition than 80.6% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 55 years old.
Nearby Bridges
OLD MIDLAND ROAD over IRRIGATION CANAL
Built 1998
WASHBURN WAY over IRRIGATION CANAL
Built 1981
SPRING LAKE RD over LOST R DIVERSION CHANNEL
Built 1981
SPRING LAKE RD over SPR.LAKE RD/DRAIN DITCH
Built 1971
OLD MIDLAND ROAD over IRRIGATION CANAL
Built 1976
HOMEDALE RD over IRRIGATION CANAL
Built 1963
HOMEDALE RD over LOST RIVER DIV. CHANNEL
Built 1979
OLD MIDLAND ROAD over IRRIGATION CANAL
Built 1973
HOMEDALE RD over NO 1 DRAIN DITCH
Built 1979
CROSS ROAD over IRRIGATION CANAL C
Built 1977
Bridge Details
- Structure #
- 35C171088800430
- Year Built
- 1971
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.3 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 409
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.