HILL ROAD over D IRRIGATION CANAL
0005 MI S OF TAYLOR ROAD · County 035, Oregon · Built 1979 · 2 Lanes · 309 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.052847, -121.600281
This bridge is in worse condition than 40.7% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 47 years old.
Nearby Bridges
HILL ROAD over IRRIGATION CANAL
Built 1965
OR 39 (HWY 050) over LOST RIVER
Built 1941
MERRILL PIT ROAD over IRRIGATION CANAL
Built 1976
ANDERSON RD over IRRIGATION CANAL
Built 1970
ANDERSON RD over IRRIGATION CANAL
Built 1981
SOUTH MERRILL ROAD over LOST RIVER
Built 2015
FALVEY ROAD over LOST RIVER
Built 1989
I O O F CEMETRY RD over IRRIGATION CANAL
Built 1972
BUESING ROAD over IRRIGATION CANAL
Built 1983
MALONE ROAD over D IRRIGATION CANAL
Built 1985
Bridge Details
- Structure #
- 35C137056601120
- Year Built
- 1979
- Length
- 13.1 m (43 ft)
- Max Span
- 12.5 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 309
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.