CLOVERLAWN DRIVE over SOUTH HIGHLINE CANAL
T36S-R5W-S29 JOSEPHINE CO · County 033, Oregon · Built 1966 · 2 Lanes · 5,391 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
42.411903, -123.3098
This bridge is in worse condition than 87.5% of bridges in County 033. The average bridge in Oregon is 0 years old; this one is 60 years old.
Nearby Bridges
HAMILTON LANE over FRUITDALE CREEK
Built 1955
HWY 482 SPUR over ROGUE RIVER
Built 1990
US 199 (HWY 025)SB over ROGUE RIVER
Built 1931
OR 99 (HWY 060) over HWY 025 & 272 NB LEGS
Built 1959
OR 238 (HWY 272) over US 199 (HWY 025) NB
Built 1959
HWY 482 SPUR over CORP
Built 1990
US199 (HWY 025)NB over ROGUE RIVER
Built 1960
RINGUETTE STREET over IRRIGATION CANAL
Built 1971
I-5 (HWY 001) over HWY 482 SPUR
Built 2008
I-5 (HWY 001) over US 199 OR 99 (HWY 025)
Built 1960
Bridge Details
- Structure #
- 320010320000089
- Year Built
- 1966
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.3 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 5,391
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.