COUNTY RD 949 over COBLEIGH RD.BIG BUTTE CR

2.01 MILEPOST · County 029, Oregon · Built 1954 · 1 Lanes · 380 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29C237949 00201
Year Built
1954
Length
92.4 m (303.1 ft)
Max Span
61 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
380
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$970,000
Total Project Cost
$1,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.