THOMPSON CREEK RD over THOMPSON CREEK

5.7 MI S OF FAP 8 JCT · County 029, Oregon · Built 1967 · 2 Lanes · 437 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
29C223927 00570
Year Built
1967
Length
10.4 m (34.1 ft)
Max Span
9.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
437
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.