N.E. 92ND AVE. over B-85 X COLUMBIA SLOUGH

0.2 MI N OF COLUMBIA BLVD · County 051, Oregon · Built 1961 · 2 Lanes · 274 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
25T13 000
Year Built
1961
Length
19.2 m (63 ft)
Max Span
6.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
274
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.