COUNTY RD 124 over FLORAS CR(N FORK)
9.1 MI E LANGLOIS · County 015, Oregon · Built 2023 · 2 Lanes · 43 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.909022, -124.32095
This bridge is in worse condition than 2% of bridges in County 015. The average bridge in Oregon is 0 years old; this one is 3 years old.
Nearby Bridges
FLORAS CREEK RD over FLORAS-CREEK
Built 1962
COUNTY RD 118 over N FK FLORAS CREEK
Built 2016
30 S 13 W 34.00: over WHITE ROCK CREEK
Built 1987
FLORAS CREEK RD over FLORAS CREEK
Built 1979
COUNTY RD 177G over WEST FORK CATCHING CREEK
Built 1973
US101(HWY009) over WILLOW CREEK
Built 1925
US101(HWY009) over MORTON CREEK
Built 1925
US101(HWY009) over FLORAS CREEK
Built 1967
US101(HWY009) over BETHEL CREEK
Built 2004
SIXES RIVER ROAD over OTTER CREEK
Built 1977
Bridge Details
- Structure #
- 24310 124 00908
- Year Built
- 2023
- Length
- 30.5 m (100.1 ft)
- Max Span
- 30.5 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 43
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.