Miami-Foley Road over Crystal Creek

MP 8.75 · County 057, Oregon · Built 2023 · 2 Lanes · 2,076 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
24064 000 00875
Year Built
2023
Length
18.5 m (60.7 ft)
Max Span
18.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,076
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.