US 97 (HWY 042) over SPANISH HOLLOW

004 MI S BIGGS JCT · County 055, Oregon · Built 2019 · 3 Lanes · 3,651 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
22538 042 00039
Year Built
2019
Length
102.4 m (336 ft)
Max Span
34.4 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
3,651
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.