HWY 091 over Lake Slough

OR 99W MP 103.68 · County 003, Oregon · Built 2018 · 2 Lanes · 6,255 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
22385 091 10368
Year Built
2018
Length
23.8 m (78.1 ft)
Max Span
23.8 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
6,255
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.