Hwy 39 (OR 18) over Chehalem Creek

MP 57.72 · County 071, Oregon · Built 2016 · 2 Lanes · 12,899 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
22008 039 05772
Year Built
2016
Length
293.9 m (964.2 ft)
Max Span
47.1 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
12,899
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.