DORRENCE LANE over WALLOWA RIVER

0.9 MI W OF HWY 82 · County 063, Oregon · Built 2011 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
21741 570 00090
Year Built
2011
Length
18.3 m (60 ft)
Max Span
18 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.