OR62 (HWY 022I +D) over East Vilas Rd.
Hwy 022I MP 3.49 · County 029, Oregon · Built 2018 · 4 Lanes · 18,831 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.389275, -122.865206
This bridge is in worse condition than 11% of bridges in County 029. The average bridge in Oregon is 0 years old; this one is 8 years old.
Nearby Bridges
OR62 (022I and D) over Swanson Creek
Built 2018
OR62 (022I + D) over Coker Butte Rd.
Built 2018
OR62 (022I + D) over Midway (Upton) Creek
Built 2018
WILSON ROAD over UPTON SLOUGH
Built 1959
MCLOUGHLIN DR over HOPKINS IRRIGATION CANAL
Built 2000
OR62 (022I and D) over Whetstone Creek
Built 2018
COUNTY RD 555 over WHETSTONE CR/E GREGORY R
Built 1960
COUNTY RD 555 over SWANSON CR/E GREGORY RD.
Built 2015
E PINE ST (WB) over BEAR CREEK
Built 1980
E PINE ST (EB) over BEAR CREEK
Built 2005
Bridge Details
- Structure #
- 21715 022I00349
- Year Built
- 2018
- Length
- 39.6 m (129.9 ft)
- Max Span
- 39.6 m
- Width
- 24.8 m (81.4 ft)
- Lanes
- 4
- Daily Traffic
- 18,831
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.