Arrowhead Crk Ln over DRAINAGE DITCH

.1 mi W of Industrial Way · County 005, Oregon · Built 2006 · 2 Lanes · 131 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20763 000 00000
Year Built
2006
Length
34.1 m (111.9 ft)
Max Span
34.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
131
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.