HWY 6 (CONN # 3) over BURNT RIVER(DIXIE CONN)

11.5 Mi N Malheur Co Line · County 001, Oregon · Built 2008 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20484 006C34059
Year Built
2008
Length
33.4 m (109.6 ft)
Max Span
32.8 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.