NORTH CANAL AVE over US 97 (HWY 004)
0.3 MI S OF REDMOND CL · County 017, Oregon · Built 2008 · 4 Lanes · 1,990 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
44.301161, -121.171619
This bridge is in worse condition than 18.6% of bridges in County 017. The average bridge in Oregon is 0 years old; this one is 18 years old.
Nearby Bridges
NE 5TH ST over PILOT BUTTE CANAL
Built 2004
2nd Street over COI Canal
Built 2005
Maple/Negus Ave over COI Canal & Canal Blvd
Built 2006
Maple/Negus Ave over US97 & BNSF
Built 2005
HWY 370 over PILOT BUTTE CANAL
Built 1961
NW MAPLE AVE over DRY CANYON
Built 2006
LARCH AVE over C.O.I.D. CANAL
Built 2008
HEMLOCK AVE over PILOT BUTTE MAIN CANAL
Built 1967
NW GALLOWAY AVE over COI CANAL-LATERAL F
Built 1990
OR 126 (HWY 015) over GLACIER HIGHLAND COUPLET
Built 2004
Bridge Details
- Structure #
- 20416 004 11933
- Year Built
- 2008
- Length
- 39.3 m (128.9 ft)
- Max Span
- 39.3 m
- Width
- 23.5 m (77.1 ft)
- Lanes
- 4
- Daily Traffic
- 1,990
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.