COUNTY RD 5A over LENEVE BRIDGE

0139 FROM JCT HWY 42 CO5A · County 011, Oregon · Built 2005 · 2 Lanes · 1,986 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
20126 005A00139
Year Built
2005
Length
62.8 m (206 ft)
Max Span
8.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,986
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.