SCENIC AVE over GRIFFIN CREEK

0.31 MI E OF OR 99 · County 029, Oregon · Built 2002 · 2 Lanes · 2,928 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
19888 708 00031
Year Built
2002
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
25.6 m (84 ft)
Lanes
2
Daily Traffic
2,928
Material
Prestressed Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.