FRANK PARRISH RD over COAST FK. WILLAMETTE R.

020 MI S SPRINGFIELD · County 039, Oregon · Built 2003 · 2 Lanes · 562 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
19882 188200022
Year Built
2003
Length
78.6 m (257.9 ft)
Max Span
39 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
562
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.