MONTGOMERY RD over SPRING CREEK
20 MI E OF MADRAS · County 031, Oregon · Built 2003 · 2 Lanes · 82 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
44.584156, -121.455122
This bridge is in worse condition than 21.3% of bridges in County 031. The average bridge in Oregon is 0 years old; this one is 23 years old.
Bridge Details
- Structure #
- 19685 000 00000
- Year Built
- 2003
- Length
- 15.7 m (51.5 ft)
- Max Span
- 15.2 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 82
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.